RU

Design of 4 villages in Kalbajar completed, work on 3 others continues

The design works for the villages of Otagli, Zar, Gamishli, Zallar and Yanshag in Kalbajar have been completed and submitted for the expert review stage, Bashir Hajiyev, Special Representative of the President of the Republic of Azerbaijan in Kalbajar district, said during the event titled “Lachin & Kalbajar: The Road from Urbicide to Post-Conflict Reconstruction” held within the framework of WUF13, APA reports.

He stated that within the framework of measures implemented to create a safe living environment in the liberated territories and accelerate the return process, construction works for the first phase of Kalbajar city have been completed and residential apartments have already been put into operation: “At the same time, the design and expert review stages for the second, third and fourth residential neighborhoods are continuing. Design works for the villages of Chaykend, Chapli and Dallakli are also ongoing.

Design works for administrative buildings covering areas of 2.42 hectares and 10.1 hectares in Kalbajar city are continuing. The construction of the Occupation and Victory Museums Complex in Kalbajar is also planned. In addition, construction works on the educational complex being built in Kalbajar city are continuing.”

 

 

 

 

Избранный
11
1
apa.az

2Источники